        Before you begin installation, prepare the power cable for the system.
        Refer to the instructions
        incontinue with the installation procedure for your system:
        . Installation Procedure for Press Down Model (U940IA)
        ~ Installation procedure for Vacuum Model (U9402A)
        Installation Procedure for Press Down Model (U940IA)
        1  Install the Press Down Unit (U940IA)
        2  Install the Controller
        3  Connect the Debug Probe
        4 Connect Power and Compressed Air Supply
        5 Power Up the System
        6  Install Medalist il000 Software
        7  Install the Fixture
        8 Align the Safety Sensors
        9  Perform a System Check
        Installation procedure for Vacuum Model (U9402A)
        1  Install the Controller
        2 Connect the Debug Probe
        3 Connect Power and Compressed Air Supply
        4 Power Up the System
        5  Install Medalist il000 Software
        6  Install the Fixture
        7  Perform a System Check
        Medallist  i1000  InStalia~tion  Guzde
        Preparing the Power Cord

        The Medalist il000 is shipped without a power cord. This allows local support
        engineers to purchase a power cord that is suitable for use in the facility
        where the system is installed and meets the regulatory requirements of the
        country.
        Be sure to purchase a power cord rated to operate at 200~240 VAC and
        10 Amps, with a minimum length of 2.5 m.
        To assemble the power cord, follow these steps:
        1    Locate  the  power  connector  provided fFigur e  8)
        Figure 8   Power connector
        2 Loosen the two screws holding the cable retainer at the back of the
           power connector. Then unscrew the black connector insert to separate
            it from the metal casing(fg_:-o :-.).
        Figure 9   Remove black connector insert
        Medealist i1000  Instaallation  G uidp
        3 Strip the insulation
        power cord through
        (Figure 10).
        of the power cord to expose the wires. Insert the
        the metal casing of the power connector
        Figure 10   Strip power cord and insert in connector
        4  Solder the wires to the correct terminals on the connector insert. The
           terminals are  numbered as  shown in "Fi;-:-1■.re  1 11-.
        Ensure the wires are connected to the correct terminals as shown in
                    .. Otherwise the system could be damaged.
        Figure 11   Solder wires to terminals